RFQ ENGINEERING DESIGN STUDY DETENTION CENTER SWITCHGEAR UPGRADES

NEW HANOVER COUNTY

REQUEST FOR QUALIFICATION

FRONT END ENGINEERING DESIGN STUDY

DETENTION CENTER SWITCHGEAR UPGRADES

RFQ 20-0267

Statements of Qualifications addressed to Sara Warmuth, Director, 200 Division Drive, Wilmington, NC 28401 and marked “RFQ #20- 0267 FRONT END ENGINEERING DESIGN STUDY DETENTION CENTER SWITCHGEAR UPGRADES” will be accepted until 4:00 P.M. EST, Friday, December 13, 2019.

New Hanover County is soliciting statements of qualifications for a front end engineering design study for needed upgrades to the facility PLCs, PLC Software, and Relays installed in the 480V Zenith Switchgear at the NHC Detention Center located at 3950 Juvenile Center Rd, Castle Hayne NC 28429.

Instructions for submitting qualifications and complete requirements and information may be obtained by clicking “Download full document” button at the top of this post or by contacting Sara Warmuth at swarmuth@nhcgov.com.

New Hanover County reserves the right to accept or reject any or all submittals.

 

Released:        Monday, November 25, 2019

« Back to news overview

Finance: 230 Government Center Dr, #165 • Wilmington, NC 28403 • Phone 910-798-7187 • Fax 910-798-7806